MATERIAL BALANCE EQUATION - II

Performance Prediction For Solution_Gas Drive with Gas_Cap Prod./Injection


INPUT   DATA

Title  

  PVT    DATA     
  Pressure   Oil FVF
Bo  
Solution GOR
Rs  
Gas FVF
Bg  
Oil Viscosity
μo  
Gas Viscosity
μg  
Gas Cap
Prod.(+) or Injected (-)
  #    psi    rbbl/stb   scf/stb   rbbl/scf    cp     cp     fraction of
total gas prod. 
1 0.0
2
3
4
5
6
7
8
9
10
11
12
13
14
15

  RELATIVE  PERMEABILITY   DATA     
  Total
Liquid
Saturation
SL  
Relative
Permeability
Ratio
(kg/ko)  
  #     
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

  RESERVOIR   DATA     
Initial Water Saturation fraction
Original Oil In Place bbls
Gas Cap to Oil Pore Vol ratio 


     Reset


OUTPUT   VARIABLES   &   GRAPHS

  Pressure Cumulative
Oil Production
Instantaneous
Gas Oil Ratio
Cumulative Gas
Production
Krg/kro Oil Recovery
Factor
Cum. GasCap
Prod./Injection
#psibblscf/bbl106scf  106scf
1 2500 0 721.0 0.0 0.0 0.0 0.0
2 2300 249986 578.2 162.4 -0.0022 4.5 0.0
3 2100 495211 1263.2 388.2 0.0158 8.8 0.0
4 1900 696939 2079.9 725.4 0.0375 12.4 0.0
5 1700 876378 2243.2 1113.2 0.044 15.6 0.0
6 1500 1130014 4687.9 1992.2 0.111 20.2 -439.5
7 1300 1301762 6945.9 2991.3 0.184 23.2 -939.0
8 1100 1442742 7925.5 4039.5 0.2308 25.8 -1463.2
9 900 1571644 9410.0 5156.8 0.3122 28.1 -2021.8
10 700 1687734 10242.5 6297.6 0.4053 30.1 -2592.2
11 500 1802921 10021.8 7464.6 0.5138 32.2 -3175.7
12 300 1936738 7896.1 8663.5 0.6227 34.6 -3775.1
13
14
15


MATERIAL BALANCE EQUATION - Solution Gas/Gas Cap Prod./Injection






       Please move your mouse over graph to display values