WELL SCHEMATIC - I     (* Example !)

Vertical Single Completion


INPUT   DATA

Well Name  

  KEY   DATES   yyyy-mm-dd  
Spud Date
Completion Date
Last Workover Date
Review Date

  SURFACE   DETAILS  
Well Coordinates (m)    E:   N:
Wellhead Type                  
KBE Elevation (ft ss)
Ground Elevation (ft ss)
KBE to Tubing Hanger (ft)
Flowline Length (ft)
Flowline I.D. (inches)

  TUBULARS   Depth (ft) Type
Casing I (shallowest) 
Casing II  
Casing III (optional)
Tubing  
Annular Fluid  
Total Depth TD

  PRODUCTION    STRING    DETAILS   
#   Quantity       DESCRIPTION     O.D.
Max.  
I.D.
Min.  
Setting
Depth  
      inch  inch   feet  
1 Top Of Cement
2 Production String Depth  
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19 Tubing Hanger
20 KBE 0.00

 EQUIPMENTS   Depth (ft)
Packer I
Packer II
Plug

 PERFORATIONS   From DepthTo Depth (ft)
A
B
C
D
E

 TOPS   Name Depth (ft)
i
ii
iii
iv
v
Oil-Water Contact
Gas-Water Contact

 REMARKS  
a  
b  
c  
d  
e  

ESP Pump Installed ? Yes No
Plot Scaling Style Default Style-2
Style-3 Style-4


     Reset


OUTPUT   GRAPHS



WELL SCHEMATIC - Single String Vertical Well

</COMMENT> <p>Unable to load graphics file</p>