WELL SCHEMATIC - II     (* Example !)

Vertical Dual Completion


INPUT   DATA

Well Name  

  KEY   DATES   yyyy-mm-dd  
Spud Date
Completion Date
Last Workover Date
Review Date

  SURFACE   DETAILS  
Well Coordinates (m)    E:   N:
Wellhead Type                  
KBE Elevation (ft ss)
Ground Elevation (ft ss)
KBE to Tubing Hanger (ft)
Flowline Length (ft)
Flowline I.D. (inches)

  TUBULARS   Depth (ft) Type
Casing (surface) 
Casing II  
Casing III (deepest)
Tubing (short) 
Tubing (long)  
Annular Fluid  
Total Depth TD

  LONG    STRING    DETAILS   
#   Quantity       DESCRIPTION     O.D.
Max.  
I.D.
Min.  
Setting
Depth  
      inch  inch   feet   Values decreasing ↓ 
1 Top Of Cement mandatory  
2 Long String depth   mandatory  
3 mandatory  
4 optional  
5
6
7
8
9
10
11
12
13
14
15
16
17
18 optional  
19 Tubing Hanger 28.5
20 KBE 0.00

  SHORT    STRING    DETAILS   
#   Quantity       DESCRIPTION     O.D.
Max.  
I.D.
Min.  
Setting
Depth  
      inch  inch   feet   Values decreasing ↓ 
1 Top Of Cement 4700 mandatory  
2 Short String depth   mandatory  
3 mandatory  
4 optional  
5
6
7
8
9
10
11
12
13
14
15
16
17
18 optional  
19 Tubing Hanger 28.5
20 KBE 0.00

 EQUIPMENTS   Depth (ft)
Packer I
Packer II (deeper)
Plug

 PERFORATIONS   From DepthTo Depth (ft)
A
B
C
D
E

 TOPS   Name Depth (ft)
i
ii
iii
iv
v
Oil-Water Contact
Gas-Water Contact

 REMARKS  
a  
b  
c  
d  
e  

Plot Scaling Style Default Style-2
Style-3 Style-4


     Reset


OUTPUT   GRAPHS



WELL SCHEMATIC - Dual String Vertical Well + Long String Equipment Details

</COMMENT> <p>Unable to load graphics file</p>

WELL SCHEMATIC - Dual String Vertical Well + Short String Equipment Details

</COMMENT> <p>Unable to load graphics file</p>